Saturday, January 2, 2016

The Green Parking Lot





Green Parking Lot Project, City Hall. "As of today, the parking lot is substantially complete and is ready to be re-opened for the winter. The parking spaces have been striped and the lot is now open. Parking is available on both sides as before. The new asphalt work is being saved until spring due to the low temperatures, and to assure we get a better product. The lot is temporarily striped and in Spring of 2016, we will resurface the asphalt and re-stripe the spaces." Mayor Sutherland.

December 2, 2015

No comments:

Post a Comment